Friday, 08 September 2017 12:28

Street bridge in Swift Current to close Sept. 11 for rehabilitation work

Written by  City of Swift Current
Rate this item
(0 votes)

Please be advised that PCL Construction, on behalf of the City of Swift Current, will be performing a rehabilitation on the South Railway Street Bridge that will include removing and replacing the asphalt surface, installation of a waterproofing membrane, replacing expansion joints, and performing concrete repairs on the existing abutments, barriers, piers and deck.

 

The work is set to begin on Monday, September 11th. The bridge will be closed to pedestrian and vehicle traffic at this time. We are anticipating the closure will last approximately one month.  Detour signage will be in place.

The City would like to thank residents and motorists for their patience during this project.

 

Read 367 times

More Swift Current News...